IFC PROJECTS
PROJECT COMPLETION PICTURES
1. REFURBISH AND REPAIR OF PIER STRUCTURE AT SAFANIYA OFFSHORE
The objective of the project was to restore and strengthen the damaged marine pier structures including anchor rails, mooring bollards, crash barriers, dock ladders, sign boards, concrete platforms, and associated structures.
THIS PROJECT IS AIMED TO:
• Improve safety for personnel and operations.
• Repair and strengthen damaged structures.
• Prevent corrosion and protect the structures from further deterioration.
• Improve access and support smooth marine operations.
• Increase the lifespan of the existing facilities and infrastructure.
PROJECT COMPLETION PICTURES
2. ARAMCO TANAJIB WELLSITE:
The objective of the project Well Site Demolition, Removal of Electrical Facilities, Fence Removal,
Excavation and Cable Burial.
THIS PROJECT IS AIMED TO:
- Electrical Facilities Removal
- Excavation & Cable Works
- Concrete Demolition & Removal
- Fence Removal
- Solar Panel System Removal